Facade and soffit:
the only work
the weather tests

Interior metalwork fails on appearance. Envelope metalwork fails on water. The details that matter are the ones nobody sees once the building is finished.

Fabricated in 304 or 316L in our own factory in Foshan, then trial-assembled before packing.

Order size
800–6,000 m²
Lead time
50–90 days
Drawing check
48 h
Water
Drained, not sealed
01

What a facade package contains

Envelope work is the only one of the six where the metal meets weather. Everything else is a finish problem; this is a physics problem.

ElementWhat it isHard partWhat we control
Rainscreen panelA folded tray fixed to a sub-frameFolded on four sides with a return, hooked or screwed to the frame.The return has to be deep enough to stiffen the panel and hide the frame.Fold line ±0.3 mm, diagonal ±1 mm
SoffitThe underside of a canopy or overhangFlat or folded panels, often with a lighting channel.It changes direction, and the change must not read as a splice.Joint 3 mm ±0.5 mm
Canopy edgeThe visible edge of an overhangFolded fascia, returns, sometimes a drip profile.Water must leave at a designed point, not at the nearest one.Drip line per approved detail
Column shroudA non-structural cover around a columnFour-sided box, ventilated top and bottom.It has to move with the building without oil-canning.Panel flatness 1.2 mm / m
LouvreFixed blades for screening or ventilationBlades on a carrier, angle set per drawing.Blade angle is what makes it work; it is also the first thing value-engineered out.Angle ±1°
02

How an envelope job runs

Slower than interior work, because the sub-frame and the water path are decided before the first panel is cut.

D0

Package intake

Drawing team

Questions in 48 h

D1–10

Frame and water path

Detailers + your engineer

Approved 1:5 details at every edge

D11–20

Prototype panel

Sample cell

One panel, one corner, one drip test

D21–60

Cut and fold

Laser · 5 brakes · V-groove

Fold record, diagonal check

D61–80

Finish

PVD · powder · anodise

Colour record per elevation

D81–90

Trial fit and crate

Trial crew

Elevation-by-elevation trial fit

03

What goes wrong on an envelope

Water is given a path, not a seal

Every edge has a designed exit. Sealant is the last line, never the first.

If skippedA sealed joint that fails in year three lets water into the frame, and the stain appears inside, not outside.

Panels are folded, not just cut flat

A return on four sides is what makes a 1.5 mm panel behave like a stiff tray.

If skippedFlat panels with no return oil-can in sunlight and read as a dented wall from forty metres.

One corner is built and tested first

The full junction is fabricated and water-tested before the run starts.

If skippedThe junction is invented on site by two trades who have never met, at height, in the rain.

04

Photographs for this package

Four photographs from one envelope job: the finished canopy, the soffit, a corner, and the underside as built.

Finished canopy over the entrance, in service
01Finished canopy over the entrance, in service
A gold-toned metal soffit seen from below, its flat panels set in a grid of joints
02A gold-toned metal soffit seen from below, its flat panels set in a grid of joints
The finished canopy against the glass facade
03The finished canopy against the glass facade
The canopy fascia and edge, seen from the paving
04The canopy fascia and edge, seen from the paving

All four are the same canopy. Ask and we send the full set at full resolution, untrimmed.

Send the drawing.
In 48 hours you get a price
and a list of problems.

PDF, DWG or DXF. You get a price, and a list of every detail we think will fail on site — whether you order or not.