The floor of the factory:
8,000 m² laid out
along the part, not the machine

Sheet comes in at one end and a numbered crate leaves at the other. In the middle, the largest empty space in the building exists for one reason.

Everything described here happens in our own factory in Foshan, working 304 and 316L stainless steel.

Floor
8,000 m²
People
~120
Trial-fit area
Largest clear span
Location
Shunde, Foshan
01

How the floor is laid out

The layout follows the part, not the machine. Sheet comes in at one end and a numbered crate leaves at the other.

ZoneWhat happens thereWhy it is where it is
Sheet store1500 × 4000 sheets, on trestles, by grade and finishAt the door, so sheet never crosses finished work
Laser cellTwo beds, cutting outlines and patternsNext to the store; dust is contained here
FormingFive press brakes and the V-groove stationsClose to the laser, because formed parts are bulky
WeldingTwenty TIG stations on a separate gridSeparated from forming so grinding dust does not settle on ground parts
FinishingBrush, polish, and the PVD lineDownstream of welding only; nothing goes back up
Trial-fit areaThe largest clear span in the buildingA full lobby job has to lie flat with room to walk around it
PackingCrates, numbering, documentsLast, next to the loading door
02

Why the trial-fit area is the biggest space

It is the one zone that produces nothing you can sell, and the reason the rest of the promises hold.

A building full of machines can make parts. It cannot prove that the parts fit, because proving it needs an empty floor the size of the room you are cladding.

We took that space anyway. It is the difference between selling capacity and selling a fitted job, and it is the reason the site can promise zero site cuts.

The area is also where the honest argument happens. Two parts that do not close are found here, while both are still ours to remake, and before the finish has been paid for twice.

03

What we do not have

  • ×
    Structural steel fabricationWe do not design or certify structural frames. Envelope work is cladding on someone else's structure.
  • ×
    CastingNo foundry. Complex solids are fabricated and dressed, not cast.
  • ×
    Anodising in-houseAnodising is outsourced. If a job needs it, the lead time is the anodiser's, not ours.
  • ×
    Site installationWe do not send fitting crews abroad. Packing, numbering and drawings are how we replace them.
  • ×
    Granite or timber workWe make the metal that meets them, and we draw the interface. We do not supply the stone.
  • ×
    A catalogueThere is no product list with prices. Every job starts at a drawing.
04

The floor, in four frames

Workshop floor with frames, panels and trolleys laid out, machines along the far wall
01Workshop floor with frames, panels and trolleys laid out, machines along the far wall
Coil stock, stacked in rows under the crane rails
02Coil stock, stacked in rows under the crane rails
A ribbed run, its ribs fixed, laid out on the shop floor
03A ribbed run, its ribs fixed, laid out on the shop floor
04 · to be shotLoading bay — crates labelled and sequenced

These four frames are being shot with a wide lens. Until they exist, ask for a video call walk-through instead — we would rather show you live than show you a stock photograph.