Trial assembly
makes zero site cuts
possible

A trading company cannot assemble your job before shipping, because the parts are not in his building. This is the one claim on this site that our competitors structurally cannot make.

Run in 304 or 316L in our own factory in Foshan — cutting, forming, welding and finishing are all done in-house.

Days
D33–36
Who
Trial-fit crew
You receive
Sign-off sheet
Jobs trial-fitted
100%
01

The step a trader cannot copy

Everything else on this site could, in principle, be arranged by a middleman with good suppliers. This step cannot, because it needs the parts to be in your own building.

The whole job is laid out on our floor and bolted together, in the same order your crew will fit it on site. Not a sample corner — the job.

Hole patterns are proved with real mating parts. Seam widths are measured where two panels actually meet. Anything that does not close is re-made now, while the parts are still in our building and the finish is still ours to redo.

What the crew does

  • Lays out every part against the elevation drawing
  • Assembles and checks every junction, including the ones that were argued about
  • Photographs the assembly, including the failures
  • Numbers each part to the install sequence and signs the sheet
Zero site cuts is not a boast about our machines. It is the direct consequence of this step.
02

What the sign-off sheet carries

FieldWhy it exists
Part numbers as assembledThe number on the sheet is the number on the crate and on the drawing.
Junction check per elevationEach junction is ticked, not assumed from a neighbouring one.
Rework listWhat failed and was re-made — with the date, so nobody claims it did not happen.
PhotographsWide, node, and the junction that was in dispute.
Install sequenceThe order the crew will fit, agreed before packing.
Signature and dateOne name. The same name that answers when something is wrong.
03

What goes wrong without it

Every junction is mated, not inferred

Parts are checked against the part they will actually touch.

If skippedTwo parts are each within tolerance and still do not meet, because tolerances accumulate in the same direction.

Failures are re-made here, not there

A part that does not close is re-cut in Foshan, with our finish and our cost.

If skippedIt is fixed on site with a shim, a sealant bead or a ream — and the finish at that edge is destroyed.

The install order is agreed before packing

The crew's sequence is known when cartons are numbered, so the order is physical, not a suggestion.

If skippedCartons are numbered by production order, which is almost never the install order.

04

Trial assembly on the floor

The photograph this site is missing most.

Three men grinding the joints on an assembled circular feature
01Three men grinding the joints on an assembled circular feature
02 · to be shotCurved counter trial-assembled in the yard
A large hammered stainless tub standing on a bench before delivery
03A large hammered stainless tub standing on a bench before delivery
A circular feature, assembled and laid out flat on the shop floor
04A circular feature, assembled and laid out flat on the shop floor

Ask us for the document
from any step.
Any step.

Every step below ends with a record. Ask for a specimen of it before you place an order — the answer tells you more than any brochure.