12 lift sets
against concrete
18 mm out of position

Twelve openings became twelve drawings. That decision is the only reason the job needed one shim instead of twenty-eight.

Material recorded per job: 304 or 316L, fabricated and trial-assembled in our Foshan factory.

Scope
12 sets
Schedule
26 d
On site
1 shim
Concrete deviation
18 mm
01

The job

Twelve lift openings across six floors, each needing a three-sided surround, a reveal and front panels. Brushed finish.

The structural openings were built by another trade, to their tolerance. Ours had to be tighter, because a surround is a straight line drawn against a wall that is not.

Why it is a case file

Because twelve openings became twelve drawings, and that decision is the only reason the job needed one shim on site instead of twenty-eight.

02

The four photographs

Inside the car — walls, handrail and controls in one finish
FIG. 03.1Inside the car — walls, handrail and controls, one finish
Car wall and ceiling, the light line folded over the corner
FIG. 03.2Car wall and ceiling, the light line folded over the corner
Car floor in stone, laid inside the metal casing
FIG. 03.3Car floor in stone, inside the casing
03

The record

Brief
Twelve lift openings, six floors, brushed stainless surrounds and front panels.
Survey
Four measurements per opening: width, height, plumb, wall thickness. Deviation up to 18 mm against the structural drawing.
Drawings
One drawing per opening, not per type. Twelve drawings, twelve sizes.
Reveal
Return width set from the measured wall thickness, so the shadow line stayed constant on every floor.
Assembly
Three-sided surrounds joined and squared on our floor before packing — the corner is a made joint, not a site joint.
On site
One shim used, on opening 7, where the floor level was 3 mm high. No site cuts.
Delay
None.

Figures in this record are being confirmed with the client before publication and are marked in the drawing set. We publish a case file only when the numbers can be checked — a wrong job record is a factual error, not a typo.

04

What we would do differently

Survey before the price, not after

Here we did, which is why the twelve drawings existed before cutting.

If skippedQuoting from the structural drawing would have priced twelve identical parts and built twelve wrong ones.

Draw per opening, never per type

Twelve drawings cost more office time and saved the whole job.

If skippedA drawing per type means eleven openings get packed out differently, and the packing-out is where the shadow gap goes wrong.

Fix the reveal width after measuring

The return was cut once, from measured wall thickness.

If skippedCut at nominal, the shadow line tapers from 5 mm at the bottom to 12 mm at the top of the same door.

Your job will look
nothing like these.
Send it anyway.

Case files are here to show how we work, not what we make. Every job starts from your drawing, and the first thing you get back is a list of problems.