Survey before the price, not after
Here we did, which is why the twelve drawings existed before cutting.
If skippedQuoting from the structural drawing would have priced twelve identical parts and built twelve wrong ones.
Twelve openings became twelve drawings. That decision is the only reason the job needed one shim instead of twenty-eight.
Material recorded per job: 304 or 316L, fabricated and trial-assembled in our Foshan factory.
Twelve lift openings across six floors, each needing a three-sided surround, a reveal and front panels. Brushed finish.
The structural openings were built by another trade, to their tolerance. Ours had to be tighter, because a surround is a straight line drawn against a wall that is not.
Because twelve openings became twelve drawings, and that decision is the only reason the job needed one shim on site instead of twenty-eight.



Figures in this record are being confirmed with the client before publication and are marked in the drawing set. We publish a case file only when the numbers can be checked — a wrong job record is a factual error, not a typo.
Here we did, which is why the twelve drawings existed before cutting.
If skippedQuoting from the structural drawing would have priced twelve identical parts and built twelve wrong ones.
Twelve drawings cost more office time and saved the whole job.
If skippedA drawing per type means eleven openings get packed out differently, and the packing-out is where the shadow gap goes wrong.
The return was cut once, from measured wall thickness.
If skippedCut at nominal, the shadow line tapers from 5 mm at the bottom to 12 mm at the top of the same door.
Case files are here to show how we work, not what we make. Every job starts from your drawing, and the first thing you get back is a list of problems.