What is in our factory
and what is not

Claims about capability are easy to write and hard to check. This section is written so that every line is either a thing you can walk around or a document you can request.

Everything described here happens in our own factory in Foshan, working 304 and 316L stainless steel.

Floor
8,000 m²
Engineers
14
TIG stations
20
Records per job
6
Workshop floor with frames, panels and trolleys laid out, machines along the far wall
The floor, mid-jobWhat is in the building, and what is not.
02

The honest scale

ItemFigureWhat it means in practice
Floor area8,000 m²Enough to lay out a full lobby job for trial assembly without stopping production.
People~120Of which 14 are engineers and detailers, and 20 are TIG welders.
Lasers2A large-format bed and a smaller one for patterns and small parts.
Press brakes5Max formed length 4,000 mm, which is also the max panel length we will quote.
TIG stations20Architectural welding only, not structural fabrication.
FinishingBrush · mirror · PVD · powderPVD is the constraint: one batch per colour, and the line sets the date.
CertificationISO 9001Process certification. It does not certify a tolerance on your job — the records do.

We have not put a number on capacity. Tonnes per month is a number for a commodity mill. For this work the limit is drawing hours and welding hours, and both are quoted per job.

Come and check
the floor
yourself.

Two hours on the floor answers more than ten documents about it. Tell us the week you are in Guangdong and we will hold the time.